Battery Energy Storage System Pilot Project, Cabo Verde, SCADA integration in LDC– OP20071254895
Remote support for Electra engineering team and tests team through the existing VPN link for SCADA Integration in LDC of the battery energy storage system.
Republic of Cabo Verde, Sal Island, Palmeira Substation.
• SCADA Integration in LDC of the battery energy storage system (signals, alarms, measures, set point, and circuit breaker on/off) without any EMS/DMS advanced functions as well as configuration of existing telecommunication network;
• existing RTU data base modification to take into account the data of the new switching station (mainly shunt reactor);
• telecommunication network configuration for a remote BESS HMI in Palmeira substation, Sal Island;
• IT Scada network configuration.